We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 various branches. For much more details: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828
EPT Windlass 24mm Electric powered Double Cable Lifter Windlass
1.Double drum hydraulic windlass intro
EPT anchor windlass is a device that restrains and manipulates the anchor chain and/or rope on a boat, enabling the anchor to be raised and reduced. A notched wheel engages the backlinks of the chain or the rope. A “trawl windlass” is a related equipment that restrains or manipulates the trawl on a business fishing vessel. The trawl is a type of large fishing net that is wound on the windlass. The fishermen possibly let-out the trawl or heaves-up the trawl for the duration of fishing operations. A brake is provided for management and a windlass is generally powered by an electrical or hydraulic motor running by means of a gear teach
Windlass can be divided into horizontal windlass and vertical windlass according to arrangement.The horizontal windlass is widely utilized in present day transport ships.For the convenience of mooring and unmooring procedure and changing the drive of cable, modern day ships usually undertake the blend of anchor and mooring winch, which brings together the anchor winch and mooring winch.In addition to the auxiliary reel at the end of the spindle, a mooring winch (primary reel) is presented on the windlass spindle, which, like the sprocket wheel, is driven by the spindle and controlled by a independent clutch and brake.Close the clutch and twi EPT or loosen the rope.Right after the cable is tightened, the brake is tightened to keep the stress state of the cable with no becoming moved to the bollard.
two. EPT anchor windlass principal parameters
Model | Dian of chain wheel(mm) | Working load(kn) | Overhead pulling pressure(kn) | Holding load(kn) | Nominal velocity(m/min) | Warping load(kn) | |||
AM2 | AM3 | AM2 | AM3 | AM2 | AM3 | ||||
17.five | 17.5 | thirteen | 14.six | 19.5 | 21.nine | eighty | 115 | nine | 8 |
19 | 19 | 15.three | 17.2 | 23. | 25.eight | ninety five | a hundred thirty five | nine | ten |
twenty | 20 | 17.nine | twenty. | 26.9 | thirty. | 110 | 157 | nine | 10 |
22 | 22 | twenty.6 | 23. | thirty.9 | 34.five | 126 | 180 | nine | 15 |
24 | 24 | 24.5 | 24.four | 36.8 | 41.1 | 149 | 214 | 9 | twenty |
26 | 26 | 28.7 | 32.1 | 43.one | forty eight.2 | 175 | 150 | 9 | 20 |
28 | 28 | 33.3 | 37.two | fifty. | 55.8 | 202 | 289 | 9 | twenty |
thirty | 30 | 38.3 | forty two.8 | fifty seven.5 | sixty four.two | 231 | 330 | nine | 30 |
32 | 32 | 43.5 | 48.6 | sixty five.3 | 72.9 | 261 | 374 | 9 | thirty |
34 | 34 | 49.1 | fifty four.nine | seventy three.7 | eighty two.four | 294 | 421 | 9 | 30 |
36 | 36 | fifty five.one | sixty one.six | eighty two.seven | ninety two.4 | 329 | 470 | 9 | 30 |
38 | 38 | sixty one.four | sixty eight.nine | 92.one | 103.4 | 365 | 522 | nine | forty |
forty | 40 | sixty eight | seventy six. | 102. | 114. | 402 | 576 | 9 | 40 |
Generally, the installation of the windlass should guarantee that the three points of the anchor chain major out (the anchor chain barrel, the chain controller and the sprocket) are in one line
Operate load: refers to the pressure measured at the outlet of the anchor chain wheel.
Overload rigidity: the limited time overload ability needed by the windlass.
Common speed: the velocity at which two anchor chains are recovered when a few are in the water and are freely suspended.
Support load: refers to the maximum static load on the anchor chain that the anchor chain wheel brake should be in a position to bear.
3.anchor windlass delivery images
4.In get to send you a mo EPT suitble model we need to have validate the pursuing information.
1), what is the winch pulling capacity?
two),what is the winch wire rope size?
three),what is the wire rope diameters?
four)You need to have the winch with single or double drum?and per drum pulling ability?
five),what is the winch functioning atmosphere?
six),Are you need energy pack?
FAQ
one. What type of following-sale solutions will you source?
One year guarantee.
Offering free rapid-wear part.
Lower charge for keep on servicing when guarantee is expired.
Unique engineer assist at any time.
We can offer totally free education to end-users.
2. Can you make tailored products?
Indeed, of system. You can send out your workshop photographs or drawings, or ju EPT tel: +86~thirteen 0571 88828l us your special calls for,
our engineers can make ideal design for you
three. Can you guide the boat for me, as we do not have our personal forwarder?
Sure, we have our possess forwarder, and we had cooperated with the forwarder much more than 5 a long time
four. Can you offer the high quality certification?
Sure, all kinds of certification are available, if you have doubt, you can arrive to our manufacturing unit and te EPT it by your self,
or you can let some third-partied to do the inspection for you.
5. How can I set up the crane?
Our engineers can come to your perform site to guidebook the set up.
six. Can I have a check out to your factory?
You can occur to our manufacturing facility anytime when you are convenient. We will make arrangement to select you up.
six.If you have pursuits, p EPT make contact with me freely.
We – EPG Team the bigge EPT gearbox & motors , vee pulleys, timing pulleys, couplings and gears manufacturing unit in China with 5 various branches. For much more particulars: Cellular/whatsapp/telegram/Kakao us at: 0086~13083988828 13858117778 0571 88828 The use of authentic products manufacturer’s (OEM) part figures or trademarks , e.g. CASE® and John Deere® are for reference functions only and for indicating item use and compatibility. Our company and the shown replacement components contained herein are not sponsored, accredited, or made by the OEM.